Our Work Speaks Louder

We've spent years getting our hands dirty—literally and figuratively—bringing industrial spaces back to life and crafting new ones that'll stand the test of time. Each project here tells its own story, with real numbers and honest results.

From century-old factories that needed serious TLC to brand-new industrial complexes built with tomorrow in mind, we've tackled it all. Click any project below to see the nitty-gritty—square footage, energy savings, materials used, the whole deal.

Riverside Manufacturing Hub

Riverside Manufacturing Hub

Location: Hamilton, ON

Size: 87,500 sq ft

Completed: 2022

Energy Efficiency: 42% reduction vs. baseline

Turned a 1920s textile mill into a multi-tenant manufacturing space. Kept the brick facade everyone loved, added solar panels on the roof, and upgraded the HVAC to something that actually works. LEED Gold certified.

Forge District Innovation Center

Forge District Innovation Center

Location: Toronto, ON

Size: 125,000 sq ft

Completed: 2023

Sustainability: Net-zero ready, rainwater harvesting

Ground-up build for tech manufacturers who wanted something that didn't look like every other glass box. Steel frame, reclaimed timber accents, green roof. Designed for flexibility 'cause who knows what they'll need in 10 years.

Distillery Heritage Adaptive Reuse

Distillery Heritage Adaptive Reuse

Location: Kingston, ON

Size: 52,000 sq ft

Completed: 2021

Heritage Status: Designated heritage site, 1880s

This one was tricky—preserving original limestone walls while making it work for modern offices and retail. Had to work with heritage committees for months. Original wood beams stayed, everything else got carefully updated.

Lakefront Industrial Park

Lakefront Industrial Park

Location: Mississauga, ON

Size: 215,000 sq ft (3 buildings)

Completed: 2023

Carbon Reduction: 38% lower embodied carbon

Master-planned three-building complex for light manufacturing. Steel sourced from Canadian mills, optimized for natural daylighting to cut down on electricity use. Stormwater management system that actually improves local watershed.

Railway Station Revitalization

Railway Station Revitalization

Location: London, ON

Size: 34,000 sq ft

Completed: 2020

Heritage: 1904 station, National Historic Site

Converted an abandoned railway station into a community hub with maker spaces and local business incubators. Original ticket windows? Still there. The challenge was updating electrical and plumbing without destroying the character.

GreenForge Production Facility

GreenForge Production Facility

Location: Waterloo, ON

Size: 96,000 sq ft

Completed: 2022

Certification: LEED Platinum, net-zero energy

Built for a cleantech company that walks the walk. Solar array covers 80% of energy needs, geothermal heating/cooling, and we used low-carbon concrete. First net-zero industrial building in the region.

Textile Mill Adaptive Reuse

Textile Mill Adaptive Reuse

Location: Guelph, ON

Size: 68,500 sq ft

Completed: 2021

Energy: 55% energy use reduction

Five-storey 1890s textile mill that sat empty for 20 years. Now it's mixed-use—light industrial on lower floors, creative offices up top. Kept those massive timber columns and exposed brick everyone's always raving about.

Port Union Logistics Center

Port Union Logistics Center

Location: Scarborough, ON

Size: 178,000 sq ft

Completed: 2023

Features: EV charging infrastructure, cool roof

High-bay logistics facility designed for future automation. Roof can handle serious snow loads plus solar panels. The clients wanted flexibility for however distribution changes in the next decade or two.

Foundry Quarter Mixed-Use

Foundry Quarter Mixed-Use

Location: Oshawa, ON

Size: 142,000 sq ft

Completed: 2022

Heritage: 1912 iron foundry restoration

Probably our most complex heritage project yet. Original crane rails stayed in place as architectural features, integrated modern MEP systems behind restored masonry walls. Ground floor retail, upper floors for artisan workshops.

Advanced Manufacturing Campus

Advanced Manufacturing Campus

Location: Cambridge, ON

Size: 285,000 sq ft (Phase 1)

Completed: 2023

Sustainability: Zero waste-to-landfill design

Master plan for a four-phase advanced manufacturing campus. Phase 1's done—focused on modular construction so future phases can adapt. Bioswales for stormwater, native plantings, and a shared central utility plant that'll serve all buildings.

Harbourfront Brewery Conversion

Harbourfront Brewery Conversion

Location: Toronto, ON

Size: 41,000 sq ft

Completed: 2020

Heritage: 1860s brewery, municipally designated

Old brewery turned into craft studio spaces and a food hall. The original copper vats were beyond saving, but we incorporated them into the design as sculptural elements. Massive skylights flood the space with natural light now.

Northern Industry Complex

Northern Industry Complex

Location: Barrie, ON

Size: 112,000 sq ft

Completed: 2023

Energy: All-electric, heat pump systems

Designed for heavy industrial use with sustainability front and center. No natural gas hookup—all electric with backup battery storage. Insulated to handle harsh winters without burning through energy. Shop floors can handle serious equipment.

Let's Talk About Your Project

Got an old building that needs rescuing or a new industrial space in mind? We've probably dealt with something similar. Drop us a line and we'll figure out if we're a good fit for what you're trying to do.

Get in Touch
Project Planning